— Property Management Quarterly — January 2017

W

hen managing construc-

tion work in commercial

buildings, property man-

agers can face myriad

challenges, depending on

the project and the scope of work.

Commercial building construction

projects can range from standard

to complex tenant finish projects

as well as significant capital con-

struction work. This might include,

but is not limited to, remodel work

of main building lobbies, eleva-

tor lobby remodel, façade repair

or remodel, parking garage repair

as well as modifying or replacing

building mechanical, electrical, life-

safety and access control systems.

Of course, there are many compo-

nents to creating a successful proj-

ect, such as quality of field survey,

budget pricing, design documents,

pricing and schedule. However, the

two most important components

are the appropriate use of building

information management and the

free flow of communication. BIM

can be used to address, enhance or

impact all of the previously men-

tioned components, including com-

munication.

The technology associated with

BIM continues to improve and can

help during the design process,

which includes creating as-built

models where either none exist

or where existing as-builts are not

accurate. As part of BIM, scanning

technology is available that will

capture existing building conditions

and then convert that information

into an electronic format. This elec-

tronic format can be used to view

those conditions electronically.

The electronic

format also can be

used to assist in

creating 3-D mod-

els of the existing

conditions. The

3-D model will

allow the design

team to accurately

align new design

content with exist-

ing conditions.

There are several

advantages of this

technology. Not

only is it the fast-

est and most accurate way to cap-

ture field data, but also it promotes

accurate alignment and reduces the

number of trips required to verify

field conditions, which will reduce,

if not eliminate, potential change

orders during construction. The

accuracy of field scanning is within

2 millimeters for interior scans and

within 3/8 inch for exterior scans

of approximately 200 feet distance.

Change orders can negatively affect

schedule and quality of work and

add unexpected costs to the proj-

ect. Scanning is not a complicated

process. As part of the Los Angeles

International Airport project, we

scanned 4 million square feet over

a 24-hour period, which allowed

the recording of as-built conditions

to be completed in a more efficient

and accurate manner.

Using BIM allows accurate design-

bid drawings to be produced. In

turn, this gives confidence to the

bid costs and schedule, which

will be accurate, provided nothing

changes (owner or tenant gener-

ated changes after design and bid).

BIM with 3-D modeling provides the

owner, tenant and other affected

parties an accurate picture of how

the design, including finishes and

colors, will look, which can be

used to adjust the design to a final,

acceptable product.

It is much easier to incorporate

green design and sustainability

features when using BIM technol-

ogy, which minimizes the negative

impact to the environment and cre-

ates operating efficiencies. BIM also

can be used for value engineering.

As a result, decisions can be made

that increase the building value

in several ways, including making

the building a more desirable work

place to create demand and low-

ering operating costs by reducing

gross rents because of the decrease

in operating expenses, which will

result in an increase in net rents. A

reputation of comfortable tenants

will help create additional demand

as well, which will improve finan-

cial performance of the property

and create satisfied ownership.

Communication

Given the impact that each of

these projects can have on the ten-

ants, customers, guests and visitors

of the building, good communica-

tion is another critical component

to a successful project. Proactive

communication helps eliminate

problems before they are created

and is another way to provide excel-

lent customer service. It also helps

the property manager be proactive

and not reactive. As the saying goes,

“A stitch in time saves nine.”

For example, when looking at a

tenant finish project, either with

new tenants or existing tenants,

the communication begins with

the leasing broker and the property

manager. The manager gains vari-

ous information through the leas-

ing broker about the scope of work,

including the tenant finish allow-

ance to be provided by the landlord,

Use building information management for projects