Previous Page  25 / 48 Next Page
Information
Show Menu
Previous Page 25 / 48 Next Page
Page Background

January 3-16, 2018

-

Page 25

www.crej.com

Finance

by Jennifer Hayes

An $18.75 million loan

was funded to Consolidated

Investment Group for its East

Park 70 Building 1 in Aurora.

Holliday Fenoglio Fowler LP

secured the refinance loan for

the 357,555-square-foot, 100

percent-occupied, newly con-

structed industrial building.

The HFF debt placement

team representing CIG includ-

ed Managing Director Josh

Simon.

The 12-year, 3.63 percent,

fixed-rate loan was funded

by a correspondent life insur-

ance lender. The loan was

structured with two years of

interest-only debt service pay-

ments and a flexible prepay-

ment in the final three years of

the loan term. Loan proceeds

were used to refinance the

property’s construction loan.

CIG developed East Park 70

Building 1 and delivered the

asset in late 2016. It is fully

occupied by a single, credit

tenant, which inked a 10-year

lease at the building situated

on 18.2 acres at 19500 E. 23rd

Ave.

East Park 70 Building 1 fea-

tures a cross-dock design,

36-foot-clear ceiling heights

and 145 stalls for trailer park-

ing.

The building is part of CIG’s

East Park 70 Industrial Park,

which, when built out, will

comprise more than 1.4 mil-

lion sf of industrial space. The

park, located along the Inter-

state 70 corridor, is approxi-

mately 16 miles from down-

town, approximately 10 miles

southwest of Denver Interna-

tional Airport, and the build-

ing has direct access to Inter-

states 70 and 225 and E-470.

“The leasing success of

this building makes us very

excited about the future of

East Park 70 and our long-

term hold strategy,” said Tim

Bertoch, CIG’s vice president

of real estate. “CIG recently

broke ground on Building 2,

a 243,200-square-foot, cross-

dock building with 32-foot

clear heights, which will be

completed in June of 2018. We

continue to see good demand

for the highly functional and

flexible space that we are

developing.”

Loan refinances newly built East Park 70 industrial building

The 357,555-square-foot building is occupied by a single tenant on a long-term lease.

comprises a 12-building, 210-

unit garden-style community.

Located less than 2 miles from

the Belleview light-rail station

and just south of the Inter-

states 25 and 225 interchange,

the community features a mix

of one- and two-bedroom

apartments that average 1,035

square feet. Timber Creek

amenities include a swimming

pool, hot tub, grilling area,

24-hour fitness center, club-

house, media lounge, cyber

café and mountain bike loaner

program.

The 7/S Denver Haus prop-

erty is located in Denver’s

Capitol Hill neighborhood

at 175 E. Seventh Ave. The

recently completed Class A

building comprises 115 stu-

dio, one- and two-bedroom

units that average 699 sf. The

apartments feature high-end

finishes, including French-

door refrigerators, quartz

countertops, faux wood floor-

ing, built-in Bluetooth speak-

ers, Nest thermostats, in-unit

washers and dryers and balco-

nies. Common area amenities

at 7/S Denver Haus include

a sky lounge, barbecue grills,

yoga studio, 24-hour fitness

center, dog spa, shuffleboard,

media lounge and electric car

charging stations.

HFF

Continued from Page 24