Colorado Real Estate Journal - September 16, 2015
Adofson & Peterson Construction completed an electrical upgrade project for UCHealth’s Poudre Valley Hospital at 1024 S. Lemay Ave. in Fort Collins. The project required updating the hospital’s electrical systems on multiple floors and renovating existing office spaces to accommodate a new electrical room. During the proposal process, A&P partnered with Intermountain Electric Inc. to provide electrical services for the project. The 24/7 hospital was fully operational during the renovation work. A&P coordinated closely with PVH and the design team to schedule outages and sequence construction during the renovation to ensure the areas served by the current electrical distribution gear experienced minimal outages. In order to meet state compliance and provide the hospital with first-rate functionality for their hospital services, the project was completed in five months. The team performed BIM services in the electrical spaces to prefabricate items, which allowed for reduction in schedule durations. In addition, new air-handling units and new fan arrays were installed so future maintenance won’t require any shutdowns.