CREJ

March 2019 \ BUILDING DIALOGUE \ 67 www.fioreandsons.com (303) 429-8893 Ops, Maintenance Transportation 730 W 62nd Avenue Denver, CO 80216 Corporate Office 80 E 62nd Avenue Suite 101 Denver, CO 80216 Heavy Civil Contractors Site Utilities - Overlot Grading - Sitework & Finish Grading Demolition & Environmental - Trucking - Civil Construction Management laboration area between the back two columns. An additional two furniture clusters with lounge-style club chairs and cocktail tables rest on the perimeter, just opposite the conversa- tion spaces. New flat-screen televisions on each column round out the space. “The lobby is energized,” added Harris. “This building is a Denver icon. The courage to make change adds to the vitality and relevan- cy of the property. The vision was to improve the experience while respecting the history. The team we put into place matched and ex- ceeded that vison.” \\ PROJECT TEAM ASSET MANAGEMENT: CS Capital Management Inc. PROJECT MANAGEMENT: JLL PROPERTY MANAGEMENT: JLL ARCHITECT/INTERIOR DESIGNER: Kieding GENERAL CONTRACTOR: Vertex ELECTRICAL CONTRACTOR: Bear Electric CORE DRILLING: DeAndrea Coring & Sawing FURNITURE CONSULTATION: Design Resource Group LIGHTING: The MH Cos. ARCHITECTURAL GLASS: Bella Glass Production / Refreshing a Denver Icon: Independence Plaza / LEFT: LED strip lighting tucked behind back-painted glass panels glow blue as the sun sets outside the lobby’s atrium.

RkJQdWJsaXNoZXIy MzEwNTM=